Sancaktepe 72-Classroom School

Project Details
Client:Turkcell İletişim Hizmetleri A.Ş.
Contractor:Nunteknik A.Ş.
Project Size:20.000 m2
Project Period:10 Months
Completion Date:2019
Location:İstanbul, Türkiye
Scope:Rough Works
Finishing Works
Electro-Mechanic Works

Project Brief

The school building, which we have undertaken as the main contractor, is located on an area of 8.500 m2 in Istanbul, Sancaktepe, Yenidogan. It consists of a basement, ground floor, and five normal floors. It is designed in 3 compound blocks separated by dilatation joints.

Each block is planned separately as high school, middle school, and primary school. The rough construction of the work was completed in as short as four months, and the total was completed in 10 months. Within the scope of the work, excavation, rough works, fine works, electrical manufacturing, mechanical manufacturing, facade works, and landscaping works have been done.